: Monday - Friday (10am - 6pm)
+233 (0) 208 107 429
ACM HOLDINGS LIMITEDACM HOLDINGS LIMITEDACM HOLDINGS LIMITED
Airport Residential, Accra

Highway Drainage Upgrade – Kumasi Sector

Portfolio

Highway Drainage Upgrade – Kumasi Sector

Heavy flooding had become a recurring problem along a major Kumasi highway corridor. ACM Holding Limited was contracted to assess and redesign the stormwater drainage system.

Highway Drainage

We removed obsolete channels and constructed a new high-capacity culvert system. The upgraded design also incorporated roadside paving and erosion control features to protect nearby communities.

Since project completion, the area has seen zero flood-related road closures. The Ghana Highway Authority commended our team for timely delivery and lasting quality.

  • Ghana Highway Authority
  • Kumasi
  • Civil Works & Infrastructure
  • 24/7/2010